  OIT Home > Committees > CNC-C2IG > C2IG Meeting Minutes 09/25/97
spacer spacer
 

C2IG Meeting Minutes September 25, 1997

 

Attendees: Kevin Barron, Ben Humphrey, Elise Meyer, Larry Murdock, Rich Prohaska, Kevin Schmidt, and Jason Simpson

Unable to Attend: Nathan Freitas, Steve Francis, Jim Frew, Stephen Pope, Vince Sefcik, and Ed Mehlschau

Action Items from Last Meeting (September 11, 1997)

Elise distributed reports from Steve Francis's Fiber Allocation data that showed the availability of fiber around campus. According to Steve's numbers, there didn't appear to be any bottlenecks.

RFI responses were distributed from Cabletron, Cisco, and 3Com. At first glance, none of those vendors currently do all of the required standards.

We discussed three options based on our current investigations:

  1. Do nothing until roughly Q2'98 when standards-based QoS functionality was available.
  2. Buy some inexpensive "disposable" equipment that could increase our bandwidth, but wouldn't address QoS.
  3. Form a partnership with some company to work with their existing equipment and functionality and work towards standards-based QoS.
In order to do ATM QoS, you need to have ATM QoS end-to-end. We discussed the fact that it was difficult to make any decision without knowing what was happening at the intercampus backbone level and what the other campuses were doing. It was decided that we should send a query to ucatm-tech@ucsb.edu, cenic-tpg@ucdavis.edu, Susan Estrada, and UCCSC@uci.edu [our query was sent to all but UCCSC – EMM 9/30/97]. We wanted to verify that our interpretation of the CalREN-2 project requirements and the current technical situation was accurate. We wanted to see what other campuses were doing. And finally we wanted to see if there was an opportunity to coordinate working with vendors with other campuses.

Action Items for Next Meeting: October 15, 1997

  • Elise and Kevin Barron would draft a note to send out to the relevant mailing lists regarding QoS implmentation.
  • Everyone was to get a copy of each RFI and read them.

Back to Main CalREN-2 Page


EMM

  spacer
spacer University of California Santa Barbara Home Page
  Copyright © 2003-2024 The Regents of the University of California, All Rights Reserved
Web contactTerms of UseAccessibility
Last modified: 10/19/2007
  spacer