  OIT Home > Committees > CNC-C2IG > C2IG Meeting Minutes 09/11/97
spacer spacer
 

C2IG Meeting Minutes September 11, 1997

 

Attendees: Nathan Freitas, Ben Humphrey, Ed Mehlschau, Elise Meyer, Steven Pope, and Kevin Schmidt

Unable to Attend: Kevin Barron, Steve Francis, Jim Frew, Larry Murdock, Vince Sefcik, and Jason Simpson

Action Items from Last Meeting (August 28, 1997)

Kevin Schmidt was able to contact the Gartner Group. First of all he wanted to validate our list of ATM specifications that were required for QoS. Yes, we need MPOA, LANEv2, UNI 4.0 Signalling, and NHRP. He asked who was doing it, and the answer was nobody really, but we should check out Newbridge, Fore, Cisco and Lucent. The primary vendors supporting voice and video over ATM are Stratacom/Cisco, Nortel, and Lucent. Gartner Group did say that the best cross-platform management tool was from Stanford Telecom, but it still wasn't as good as using the hardware vendor's management platform. Ed Mehlschau noted that one of the criticisms of Quality of Service was that QoS wasn't needed if you properly sized your network.

Finalize ATM Requirements List

The list of ATM requirements developed by Kevin Schmidt and Elise was reviewed. The final version was sent to vendors. The group also identified the key questions that we definitely wanted vendors to answer if they were unwilling to answer the entire list.

Vendor Assignments and Additional Vendors to Survey

  • Steve Francis: IBM & Xylan
  • Elise: Bay
  • Kevin Schmidt: Cisco & NEC
  • Kevin Barron: Fore
  • Nathan: 3Com
  • Stephen: Newbridge
  • Ben: Lucent/Agile Networks (or Kevin Schmidt)
  • Larry: Cabletron (or Elise)
  • Ed: Alcatel Data Networks/Alcatel Network Systems

Action Items for Next Meeting: September 25, 1997

  • Elise would draft a note to send out with our list of ATM questions. Once that was complete, everyone would send out the RFI to their vendors.
  • Steve Francis would provide the Fiber Ring Allocation information.

Back to Main CalREN-2 Page


EMM

  spacer
spacer University of California Santa Barbara Home Page
  Copyright © 2003-2024 The Regents of the University of California, All Rights Reserved
Web contactTerms of UseAccessibility
Last modified: 10/19/2007
  spacer